alwaysdobetter Get a Free Demo

How much does an electrical panel upgrade cost in 2026?

An electrical panel upgrade costs about $1,500 to $4,000. Upgrading to a 200-amp service runs $2,000 to $3,500, while a straight 100-amp panel swap is $1,200 to $2,000. Moving the panel, replacing the service entrance, or trenching for an underground feed all push the total higher.

We build websites and SEO for electricians, and we run our own home-service companies. This is a job homeowners research carefully because it's a safety item. Here's the honest cost, what changes it, and the signs you actually need one.

Cost by service size

100-amp panel swap

$1,200–$2,000

Replacing an old or recalled 100-amp panel with a new one of the same size. The least expensive upgrade, common when the panel is failing but the home doesn't need more capacity.

Upgrade to 200-amp service

$2,000–$3,500

The most common modern upgrade. Doubles capacity for EV chargers, heat pumps, and additions. Includes a new panel, breakers, meter base, and often the service entrance.

400-amp or complex upgrade

$4,000–$8,000+

For large homes, workshops, or all-electric properties. Often involves utility coordination, a new mast, and trenching. The high end of residential electrical work.

What moves the price

When you don't need an upgrade

Panel work is never DIY — it's a licensed, permitted job. But you may not need it at all if:

You do need an upgrade if your panel is full, runs on 60 amps, uses outdated fuses, is a recalled brand, shows scorching or rust, or can't support an EV charger or heat pump. Those are safety and capacity issues worth handling promptly.

Where we fit

If you're an electrician, panel upgrades are high-ticket jobs that homeowners research before they call. A page like this captures that search and routes it to your phone. We hand-build the site, add 24/7 AI lead capture, and publish researched cost guides every month. Plans run $249/mo for the site plus lead capture, $597/mo to add the monthly SEO engine, and from $1,750/mo for the full CRM and reputation stack. Month-to-month, and you own everything. See electrician website design, electrician SEO, or what local SEO costs.

We don't post stock testimonials. On a 15-minute call we screen-share the real dashboards behind our own businesses — live leads, rankings, and the exact page that produced each one. See the proof →

Common questions

Do I need 200 amps?

Likely yes if you're adding an EV charger, heat pump, hot tub, or addition, or if your panel is full or under 100 amps. Many older homes can't support modern electric loads without it.

How long does it take?

Most panel upgrades take four to eight hours, with the power off for part of the day. Service-entrance and utility coordination can stretch it across two visits.

Why is permitting important?

Panel work must be permitted and inspected for safety and insurance. An unpermitted upgrade can fail a home sale and isn't worth the small savings. A real quote includes it.

Run an electrical company?

Send your company name and metro — we'll confirm your market is open and build a working demo within 48 hours. Free, no card, no commitment.

Prefer email? [email protected]

Get a Free Demo