An excavation estimate needs scope, estimated cubic yards of cut and fill, equipment by type and hours, haul-off and disposal, utility locates, site access notes, and an unforeseen-conditions clause before it shows a total. The two lines that keep an excavation bid from sinking are the yardage estimate and the rock clause — hit groundwater or ledge without one and the job eats your margin.
Below is a copyable layout, how to price by yardage and machine hours, and the point where a document is no longer the thing holding back the business.
What you're digging, grading, or backfilling, with estimated cubic yards of cut and fill. The number every other line depends on.
Each machine — excavator, dozer, skid steer — with estimated hours and operator time, plus mobilization to haul it in.
Trucking spoil off site and dump or tipping fees. Easy to underprice, and a real cost on any sizable dig.
Utility locate handling and a clause that rock, water, or buried debris is a change order at a stated rate.
A solid template is enough while:
The template stops being the bottleneck when bids pile up faster than you can follow, or you want builders and homeowners searching "excavation contractor" to actually find you.
A tight bid only matters if you're invited to bid. We build excavation sites that show your machines and finished sites and capture requests while you're on a job. Here's what operators say.
We don't post stock testimonials. On a 15-minute call we screen-share the real dashboards behind our own businesses — live leads, rankings, and the exact page that produced each one. See the proof →
Plans start at $249/mo for a hand-built site plus AI lead capture and hosting, $597/mo with the SEO content engine and lead attribution, and from $1,750/mo for the full CRM and reputation stack. Month-to-month, you own it, one excavator per market. We run our own cleaning and HVAC companies on the same stack. See excavation website design, excavation SEO, and the AI receptionist.
Scope, cubic yards of cut and fill, equipment and hours, haul-off and disposal, utility locates, access notes, an unforeseen-conditions clause, the total, and terms.
By cubic yards moved plus equipment and operator hours, then haul-off, disposal, and mobilization. Estimating yardage protects you when a dig is bigger than it looks.
Yes. Rock, water, and buried debris can multiply costs. A clause billing them as a change order at a stated rate protects your margin.